Design
Site survey, measurement strategy, instrument and equipment selection, control philosophy and sequence of operation, wiring and schematic design, and a priced bill of quantities.
Home/Delivery
Delivery Model
Tungatech takes the full chain of design, supply, integration and maintenance, or any part of it. The scope is agreed before pricing and set out in the quotation, so the client engages Tungatech on the terms that suit the project.
Delivery Stages
Most clients take all four, because a single accountable party removes the gaps between them. Where a client needs only one or two, Tungatech scopes to that and defines the interface with the other parties in writing.
Site survey, measurement strategy, instrument and equipment selection, control philosophy and sequence of operation, wiring and schematic design, and a priced bill of quantities.
Procurement against the approved schedule, direct from the manufacturer where the relationship allows. Equipment is ordered against a confirmed project, so specification follows the application rather than stock on hand.
Installation, termination, addressing, controller programming, point-to-point commissioning, functional testing against the sequence of operation, and operator training.
Preventative maintenance schedule, calibration verification, fault response, and periodic performance review against the commissioned baseline.
Handover includes as-built documentation, the point schedule with engineering units, the commissioning test record and the maintenance schedule. Systems are handed over without temporary overrides, disabled interlocks or undocumented logic in place.
Safety
Tungatech does not work on live or energised equipment without a written procedure covering isolation, permits, personal protective equipment and lock-out tag-out.
Safety interlocks and protective devices remain in service throughout installation and commissioning. Where a requirement would place either at risk, Tungatech proposes an alternative method that achieves the same operational outcome safely.
Every Tungatech proposal states the safety implications of the proposed work, including any isolation required, the plant affected, and the outage window needed.
Written procedure before any work involving live conductors, interlocks or protective devices.
Specified against the task and the fault level of the installation.
Applied and verified before work starts, released only by the person who applied it.
The plant affected and the duration required are stated in the proposal, so the client can plan around it.
Quality
Compliance
| Incorporation | Companies and Other Business Entities Act (Chapter 24:31), Harare, October 2022 |
|---|---|
| PRAZ registration | PR2413058986. Category GE001: Electrical Products, Cables and Materials, Power Back-Up Equipment, Transformers, Standby Generators, Consumables and Accessories |
| Tax status | ZIMRA tax clearance (ITF263) current. Tax Identification Number 2001726703 |
| Certificates | Current certificates issued on request for tender and supplier registration purposes |
Commercial
Tungatech prices each project from supplier costs current at the date of quotation, so the client sees the true landed cost for the equipment actually specified.
Each quotation states the equipment schedule with make and model, the installed cost in United States Dollars, the delivery lead time, and the validity period of the pricing. Where the scope produces a measurable operational saving, the quotation states the expected saving, the basis of the estimate, and the resulting payback period.
Capital purchase and service-based commercial structures are both available. Under a service structure the client pays a periodic fee covering equipment, installation and ongoing maintenance in place of a single capital sum.
Make, model and specification against each measurement point.
With delivery lead time and the validity period of the pricing stated.
The installation and commissioning work included, and anything excluded.
Isolation required, plant affected and the outage window needed.
Recommended interval with the cost of an annual service agreement.
One accountable person for the delivery.
Tungatech attends site, surveys the existing installation, and issues a priced proposal with an equipment schedule and programme.